Changes

Jump to navigation Jump to search
Line 28: Line 28:  
*erosion management,
 
*erosion management,
 
*incorporating into parks and other green recreational spaces, and
 
*incorporating into parks and other green recreational spaces, and
*distributing across a larger development site.}} <br>
+
*distributing across a larger development site.}}
    
[[LID Case Studies#Dry Ponds|Click here to read a case study on dry ponds at the The University of Toronto Scarborough campus.]]
 
[[LID Case Studies#Dry Ponds|Click here to read a case study on dry ponds at the The University of Toronto Scarborough campus.]]
 +
 +
[[File:Screenshot 2025-08-25 144851.png|400px|thumb|left|link=https://sourcetostream.com/2024-track-1-day-1-denich-eves/|Click on the image to read about a centralized sub-surface storage infiltration facility with OGS pre-treatment located beneath an existing dry-pond in the Lake Simcoe Watershed]]
 
<br clear="all" />
 
<br clear="all" />
  

Navigation menu