The forebay should be separated from the main pond by an earthen berm, which should be constructed as a small dam since the downstream portion of the pond remains dry. A weir at the top of the berm will convey flows to the downstream section during storm events. To facilitate maintenance, a pipe with an upstream valve should be installed within the berm to allow the forebay to be drawn down for cleaning. The berm should also be planted with emergent vegetation to enhance filtration of water as it passes over.
 
The forebay should be separated from the main pond by an earthen berm, which should be constructed as a small dam since the downstream portion of the pond remains dry. A weir at the top of the berm will convey flows to the downstream section during storm events. To facilitate maintenance, a pipe with an upstream valve should be installed within the berm to allow the forebay to be drawn down for cleaning. The berm should also be planted with emergent vegetation to enhance filtration of water as it passes over.
 
===Inlet===
 
===Inlet===
[[File:Screenshot 2025-08-20 115733.png|400px|thumb|left|Dry pond inlet (MOE, 2003)]]<br clear="all" />
+
The number of discharge points into the pond should be kept to a minimum. To reduce erosion risk, the use of environmental stone or interlocking blocks with large openings that support vegetative growth is recommended at the inlet. A flow deflector or energy dissipation blocks may also be installed to limit scour and prevent the resuspension of previously settled pollutants from the pond bottom.
 +
[[File:Screenshot 2025-08-20 115733.png|400px|thumb|right|Dry pond inlet (MOE, 2003)]]<br clear="all" />
 +
 
 
===Outlet===
 
===Outlet===
 
The performance of a dry pond can be enhanced via a shallow micropool at the
 
The performance of a dry pond can be enhanced via a shallow micropool at the