   - **Form SW2** – Stormwater Management Facilities
 
   - **Form SW2** – Stormwater Management Facilities
 
   - **Form SW3** – Third Pipe Collection Systems
 
   - **Form SW3** – Third Pipe Collection Systems
 +
 
Prepare a Design Report including:
 
Prepare a Design Report including:
 
* [[Engineering drawings]]
 
* [[Engineering drawings]]
Line 29: Line 30:  
* The design aligns with CLI-ECA criteria.
 
* The design aligns with CLI-ECA criteria.
 
* The system is designed for proper stormwater management without negative impacts.
 
* The system is designed for proper stormwater management without negative impacts.
The **Municipal Owner** must sign off on compliance forms confirming:
+
The Municipal Owner must sign off on compliance forms confirming:
 
* The alteration does not result in adverse effects.
 
* The alteration does not result in adverse effects.
 
* It aligns with jurisdictional stormwater management objectives.
 
* It aligns with jurisdictional stormwater management objectives.
 +
 
===Step 5: Submit a Director Notification (If Required)===
 
===Step 5: Submit a Director Notification (If Required)===
 
Some alterations require notification to the MECP Director within specific timeframes:
 
Some alterations require notification to the MECP Director within specific timeframes:
Line 40: Line 42:  
* Verification documents
 
* Verification documents
 
* Compliance assessment
 
* Compliance assessment
 +
 
===Step 6: Conduct Post-Construction Inspection and Verification===
 
===Step 6: Conduct Post-Construction Inspection and Verification===
 
* Inspect LID and stormwater systems to ensure they function as designed.
 
* Inspect LID and stormwater systems to ensure they function as designed.