Changes

Jump to navigation Jump to search
12 bytes removed ,  10 months ago
Line 43: Line 43:  
* Inspect LID and stormwater systems to ensure they function as designed.
 
* Inspect LID and stormwater systems to ensure they function as designed.
 
* Complete "Post-Construction Verification" on relevant forms.
 
* Complete "Post-Construction Verification" on relevant forms.
* Document key performance indicators such as [[infiltration rates]], [[flow control effectiveness]], and [[pollutant removal efficiency]].
+
* Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.
    
===Step 7: Maintain Ongoing Compliance and Record-Keeping===
 
===Step 7: Maintain Ongoing Compliance and Record-Keeping===

Navigation menu