   - **Form SW3** – Third Pipe Collection Systems
 
   - **Form SW3** – Third Pipe Collection Systems
 
Prepare a Design Report including:
 
Prepare a Design Report including:
* Engineering drawings
+
* [[Engineering drawings]]
 
* Hydraulic calculations
 
* Hydraulic calculations
* LID performance criteria
+
* [[LID performance criteria]]
* Maintenance plans
+
* [[Maintenance plans]]
 +
 
 
===Step 4: Obtain Engineering and Owner Verification===
 
===Step 4: Obtain Engineering and Owner Verification===
 
A Licensed Engineering Practitioner must verify that:
 
A Licensed Engineering Practitioner must verify that: