| Line 15: |
Line 15: |
| | - **Form SW2** – Stormwater Management Facilities | | - **Form SW2** – Stormwater Management Facilities |
| | - **Form SW3** – Third Pipe Collection Systems | | - **Form SW3** – Third Pipe Collection Systems |
| − | - Prepare a **Design Report** including:
| + | Prepare a Design Report including: |
| − | - Engineering drawings
| + | * Engineering drawings |
| − | - Hydraulic calculations
| + | * Hydraulic calculations |
| − | - LID performance criteria
| + | * LID performance criteria |
| − | - Maintenance plans
| + | * Maintenance plans |
| − | | + | ===Step 4: Obtain Engineering and Owner Verification=== |
| − | ### **Step 4: Obtain Engineering and Owner Verification**
| + | A Licensed Engineering Practitioner must verify that: |
| − | - A **Licensed Engineering Practitioner** must verify that:
| + | * The design aligns with CLI-ECA criteria. |
| − | - The design aligns with CLI-ECA criteria.
| + | * The system is designed for proper stormwater management without negative impacts. |
| − | - The system is designed for proper stormwater management without negative impacts.
| + | The **Municipal Owner** must sign off on compliance forms confirming: |
| − | - The **Municipal Owner** must sign off on compliance forms confirming:
| + | * The alteration does not result in adverse effects. |
| − | - The alteration does not result in adverse effects.
| + | * It aligns with jurisdictional stormwater management objectives. |
| − | - It aligns with jurisdictional stormwater management objectives.
| + | ===Step 5: Submit a Director Notification (If Required)=== |
| − | | + | Some alterations require notification to the MECP Director within specific timeframes: |
| − | ### **Step 5: Submit a Director Notification (If Required)**
| + | * 30 days after placing new works into service. |
| − | - Some alterations require notification to the **MECP Director** within specific timeframes:
| + | * 90 days if previously undocumented infrastructure is discovered. |
| − | - **30 days** after placing new works into service.
| + | The notification must include: |
| − | - **90 days** if previously undocumented infrastructure is discovered.
| + | * Project description |
| − | - The notification must include:
| + | * Verification documents |
| − | - Project description
| + | * Compliance assessment |
| − | - Verification documents
| + | ===Step 6: Conduct Post-Construction Inspection and Verification=== |
| − | - Compliance assessment
| + | * Inspect LID and stormwater systems to ensure they function as designed. |
| − | | + | * Complete "Post-Construction Verification" on relevant forms. |
| − | ### **Step 6: Conduct Post-Construction Inspection and Verification**
| + | * Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency. |
| − | - Inspect LID and stormwater systems to ensure they function as designed.
| + | ===Step 7: Maintain Ongoing Compliance and Record-Keeping=== |
| − | - Complete **Post-Construction Verification** on relevant forms.
| + | Establish a Stormwater System Maintenance Plan that includes: |
| − | - Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.
| + | * Routine inspections (e.g., sediment removal, vegetation management for LIDs) |
| − | | + | * Adaptive management strategies for system improvements |
| − | ### **Step 7: Maintain Ongoing Compliance and Record-Keeping**
| + | Retain compliance records for a minimum of **10 years**. |
| − | - Establish a **Stormwater System Maintenance Plan** that includes:
| + | Submit annual performance reports if required by municipal or provincial regulations. |
| − | - Routine inspections (e.g., sediment removal, vegetation management for LIDs)
| |
| − | - Adaptive management strategies for system improvements
| |
| − | - Retain compliance records for a minimum of **10 years**.
| |
| − | - Submit annual performance reports if required by municipal or provincial regulations.
| |
| | | | |
| | ## Additional Resources | | ## Additional Resources |