   - **Form SW2** – Stormwater Management Facilities
 
   - **Form SW2** – Stormwater Management Facilities
 
   - **Form SW3** – Third Pipe Collection Systems
 
   - **Form SW3** – Third Pipe Collection Systems
- Prepare a **Design Report** including:
+
Prepare a Design Report including:
  - Engineering drawings
+
* Engineering drawings
  - Hydraulic calculations
+
* Hydraulic calculations
  - LID performance criteria
+
* LID performance criteria
  - Maintenance plans
+
* Maintenance plans
 
+
===Step 4: Obtain Engineering and Owner Verification===
### **Step 4: Obtain Engineering and Owner Verification**
+
A Licensed Engineering Practitioner must verify that:
- A **Licensed Engineering Practitioner** must verify that:
+
* The design aligns with CLI-ECA criteria.
  - The design aligns with CLI-ECA criteria.
+
* The system is designed for proper stormwater management without negative impacts.
  - The system is designed for proper stormwater management without negative impacts.
+
The **Municipal Owner** must sign off on compliance forms confirming:
- The **Municipal Owner** must sign off on compliance forms confirming:
+
* The alteration does not result in adverse effects.
  - The alteration does not result in adverse effects.
+
* It aligns with jurisdictional stormwater management objectives.
  - It aligns with jurisdictional stormwater management objectives.
+
===Step 5: Submit a Director Notification (If Required)===
 
+
Some alterations require notification to the MECP Director within specific timeframes:
### **Step 5: Submit a Director Notification (If Required)**
+
* 30 days after placing new works into service.
- Some alterations require notification to the **MECP Director** within specific timeframes:
+
* 90 days if previously undocumented infrastructure is discovered.
  - **30 days** after placing new works into service.
+
The notification must include:
  - **90 days** if previously undocumented infrastructure is discovered.
+
* Project description
- The notification must include:
+
* Verification documents
  - Project description
+
* Compliance assessment
  - Verification documents
+
===Step 6: Conduct Post-Construction Inspection and Verification===
  - Compliance assessment
+
* Inspect LID and stormwater systems to ensure they function as designed.
 
+
* Complete "Post-Construction Verification" on relevant forms.
### **Step 6: Conduct Post-Construction Inspection and Verification**
+
* Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.
- Inspect LID and stormwater systems to ensure they function as designed.
+
===Step 7: Maintain Ongoing Compliance and Record-Keeping===
- Complete **Post-Construction Verification** on relevant forms.
+
Establish a Stormwater System Maintenance Plan that includes:
- Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.
+
* Routine inspections (e.g., sediment removal, vegetation management for LIDs)
 
+
* Adaptive management strategies for system improvements
### **Step 7: Maintain Ongoing Compliance and Record-Keeping**
+
Retain compliance records for a minimum of **10 years**.
- Establish a **Stormwater System Maintenance Plan** that includes:
+
Submit annual performance reports if required by municipal or provincial regulations.
  - Routine inspections (e.g., sediment removal, vegetation management for LIDs)
  −
  - Adaptive management strategies for system improvements
  −
- Retain compliance records for a minimum of **10 years**.
  −
- Submit annual performance reports if required by municipal or provincial regulations.
      