Stormwater practices suitable for functional monitoring may include ones that:
+
Stormwater practices suitable for ''''functional monitoring'''' may include ones that:
−
# have [[Inspection and Maintenance: Underground Infiltration Systems|underground drainage pathways]] that may not be captured through visual inspections;
+
# Have [[Inspection and Maintenance: Underground Infiltration Systems|underground drainage pathways]] that may not be captured through visual inspections;
−
# have undergone design modifications during construction that may have influenced system function;
+
# Have undergone design modifications during construction that may have influenced system function;
−
# were identified during visual inspections as having potential deficiencies;
+
# Were identified during visual inspections as having potential deficiencies;
−
# could benefit from additional monitoring to refine planned maintenance programs or elucidate system response and function during [[Understanding rainfall statistics|rain events]] of varying size
+
# Could benefit from additional monitoring to refine planned maintenance programs or elucidate system response and function during [[Understanding rainfall statistics|rain events]] of varying size.
+
+
Stormwater practices that may be suitable for ''''performance monitoring'''' may include:
+
# New technologies for which detailed monitoring data are needed to verify performance against design criteria and/or provide information on potential design improvements for future site applications;
+
# Technologies or series of technologies configured or installed in a unique way for which detailed monitoring data are needed to understand performance;
+
# Projects designed as a pilot demonstration with specific learning outcomes that could be transferred to future sites with similar technologies or management measures.