<h4>Sizing</h4>
 
<h4>Sizing</h4>
<ol>
+
{{:Bioretention: Sizing and modeling}}
<li>Gather input data:  
  −
<ul>
  −
<li>The applicable infiltration coefficient (q) is calculated by applying the safety factor to the [[Infiltration testing|measured infiltration rate]].</li>
  −
<li>Determine the drainage catchment area (A<sub>D</sub>), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP. </li></li>
  −
<li>Unless the biomedia fill material has been tested and certified otherwise, a porosity value (V<sub>r</sub>) of 0.4 may be assumed (i.e. void ratio 40%). </li>
  −
<li>Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (c<sub>c max</sub>) from the site constraints. The [[Infiltration]] page has some of these listed. </li>
  −
<li>Identify the duration (D) and intensity (i) of design storm(s). </li></ul>
  −
<li>Calculate the required area</li>
  −
 
  −
<ThirdLeft>
  −
<panelWarning>
  −
<strong>[[Media:Infiltration Sizing.xlsx|Download .xlsx calculation tool]]</strong>
  −
</panelWarning>
  −
</ThirdLeft><TwoThirdRight></TwoThirdRight><clearFix></clearFix>
  −
 
  −
<clearFix></clearFix>
  −
</ol>
       