Changes

Jump to navigation Jump to search
Line 157: Line 157:  
[[Bioretention]] and [[Permeable pavement]] practices within the municipal road right of way (ROW). Permeable pavement was incorporated at the end of resident’s driveways and bioretention units were situated along frontages in the boulevard. To read more about the Lakeview project being a fully functional LID demonstration showcase site that can be used as a model for future ROW retrofit projects, click the button above.  
 
[[Bioretention]] and [[Permeable pavement]] practices within the municipal road right of way (ROW). Permeable pavement was incorporated at the end of resident’s driveways and bioretention units were situated along frontages in the boulevard. To read more about the Lakeview project being a fully functional LID demonstration showcase site that can be used as a model for future ROW retrofit projects, click the button above.  
   −
{{Clickable button|[[File:Portico church retrofit.PNG|130 px|link=https://cvc.ca/wp-content/uploads//2021/07/CaseStudy_Portico_Final.pdf]]}}
+
{{Clickable button|[[File:Portico church retrofit.PNG|130 px|link=https://www.jenkinssoil.ca/wp-content/uploads/2021/02/CaseStudy_Portico_Final.pdf]]}}
    
The PORTICO Community Church site, located in Mississauga, ON. was one of the first site to develop an LID parking lot in the province, in accordance with [https://sustainabletechnologies.ca/app/uploads/2013/01/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf|CVC/TRCA LID Stormwater Guidelines]. The 2 hectare parking lot at Portico Community Church features [[Permeable pavement]], [[Bioretention]] and two [[Bioswales]]. These LID features help to treat and reduce runoff flowing into the Credit River. Read more about this site and how the church , CVC and volunteers worked together to set up an ongoing maintenance schedule for the LID installations mentioned by clicking the button above.
 
The PORTICO Community Church site, located in Mississauga, ON. was one of the first site to develop an LID parking lot in the province, in accordance with [https://sustainabletechnologies.ca/app/uploads/2013/01/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf|CVC/TRCA LID Stormwater Guidelines]. The 2 hectare parking lot at Portico Community Church features [[Permeable pavement]], [[Bioretention]] and two [[Bioswales]]. These LID features help to treat and reduce runoff flowing into the Credit River. Read more about this site and how the church , CVC and volunteers worked together to set up an ongoing maintenance schedule for the LID installations mentioned by clicking the button above.

Navigation menu