Changes

Jump to navigation Jump to search
Line 196: Line 196:  
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
 
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
 
|-
 
|-
|'''Permeable Interlocking Pavements'''
+
|'''Permeable pavement with underdrain and liner'''
 
|No-some volume reduction occurs through evaporation
 
|No-some volume reduction occurs through evaporation
 
|Yes-size for water quality storage requirement
 
|Yes-size for water quality storage requirement

Navigation menu