Line 10: |
Line 10: |
| | | |
| Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: | | Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: |
− | * Filter strip length of 5 metres. | + | * Filter strip length of 5 metres and width of 100 metres. |
| * Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1. | | * Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1. |
| * Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet. | | * Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet. |
Line 44: |
Line 44: |
| ===25-Year life cycle cost break down=== | | ===25-Year life cycle cost break down=== |
| | | |
− | [[File:25yr LCCT VegStrip Full Infil.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']] | + | [[File:25yr LCCT VegStrip Full Infil 2023.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']] |
| | | |
| <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> | | <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> |
| + | </br> |
| | | |
| ===50-Year life cycle cost break down=== | | ===50-Year life cycle cost break down=== |
| | | |
− | [[File:50yr LCCT VegStrip Full Infil.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']] | + | [[File:50yr LCCT VegStrip Full Infil 2023.PNG|thumb|center|900px|'''Vegetated Filter Strips: Full Infiltration''']] |
| | | |
| <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> | | <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> |
| + | </br> |
| | | |
| ==Cost Summary Tables== | | ==Cost Summary Tables== |
Line 58: |
Line 60: |
| | | |
| ===Full Infiltration=== | | ===Full Infiltration=== |
− | [[File:Filter bed grass pass.png|500px|thumb|Exampel of a mature filter strip beside a major highway, Washington State, U.S. (Photo Source: Washington State Department of Transportation, 2018)<ref>Washington State Department of Transportation. 2018. Vegetated Filter Strips: Low-impact development fact sheet. Authored by: Maria Cahill, Derek Godwin, and Jenna Tilt. Published June 2018. Accessed: 14 July 2022. https://catalog.extension.oregonstate.edu/em9208/html</ref>]] | + | [[File:Filter bed grass pass.png|600px|thumb|Exampel of a mature filter strip beside a major highway, Washington State, U.S. (Photo Source: Washington State Department of Transportation, 2018)<ref>Washington State Department of Transportation. 2018. Vegetated Filter Strips: Low-impact development fact sheet. Authored by: Maria Cahill, Derek Godwin, and Jenna Tilt. Published June 2018. Accessed: 14 July 2022. https://catalog.extension.oregonstate.edu/em9208/html</ref>]] |
| | | |
− | [[File:Design Table VegStrip Full Infil.PNG|700px]]<br> | + | [[File:Design Table VegStrip Full Infil update 2023.PNG|800px]]<br> |
| </br> | | </br> |
| | | |
| ==References== | | ==References== |