Changes

Jump to navigation Jump to search
Line 35: Line 35:       −
Above you can find a breakdown of construction costs by expense type for a 500 m<sup>2</sup> surface area facility (I:P area ratio of 4:1)<br>
+
Above you can find a breakdown of construction costs by expense type for the 500 m<sup>2</sup> surface area vegetated filter strip (I:P area ratio of 4:1)<br>
    
The Material & Installation expenses represent the largest portion of total construction costs (55%).
 
The Material & Installation expenses represent the largest portion of total construction costs (55%).

Navigation menu