* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
* Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
* Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet.
* Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet.
−
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
+
* Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from curb inlets and outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing.
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
* Impervious drainage area to pervious swale footprint area of 10:1 (tool default value).
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).
* Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values).