Above you can find a breakdown of construction costs by expense type for the 50,000 L below-ground cistern design configuration.  
+
Above you can find a breakdown of construction costs by expense type for the 50,000 L below-ground concrete cistern design configuration.  
    
The Material & Installation expenses represent the largest portion of total construction costs (86%).
 