Changes

Jump to navigation Jump to search
Line 33: Line 33:       −
Above you can find a cost breakdown of a below-ground concrete cistern that possesses a 50,000L capacity limit in the following configurations type:<br>
+
Above you can find a breakdown of construction costs by expense type for the 50,000 L below-ground cistern design configuration.
#[[Rainwater harvesting|Rainwater Harvesting: No Infiltration]]
     −
The Material & Installation expenses represent the largest portion of total construction costs (84%).
+
The Material & Installation expenses represent the largest portion of total construction costs (86%).
    
==Life Cycle Costs==
 
==Life Cycle Costs==

Navigation menu