| Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: | | Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: |
− | * Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate. | + | * Native soil infiltration rate for Full Infiltration Design scenario was assumed to be 20 mm/h, and a safety factor of 2.5 was applied to calculate the design infiltration rate. |
− | * Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing. | + | * Ditch inlet catch basin structure located at furthest downgradient end, with connection to storm sewer pipe, included as the outlet. |
| + | * Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from curb inlets and outlet catch basin annually, and removal of weeds twice a year. Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing. |
| * Impervious drainage area to pervious swale footprint area of 10:1 (tool default value). | | * Impervious drainage area to pervious swale footprint area of 10:1 (tool default value). |
| * Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values). | | * Designed with a trapezoidal cross section with a top width of 4.75 m, bottom width of 0.75 m, and 2.5:1 side slopes (tool default values). |
Line 22: |
Line 23: |
| | | |
| ===Notes=== | | ===Notes=== |
− | * Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]], and ditch inlet catch basin structure connected to downstream storm sewer pipe as outlet. | + | * Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]]. |
| * Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation. | | * Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation. |
− |
| |
− |
| |
− | * The Tool assumes an in-line system.
| |
− | * The Tool assumed curb-and-gutter around the circumference of the facility with curb-cut inlets every 6 to 0.5 meter squared and stone splash pads.
| |
− | * The greater the slope, the more check dams placed by the Tool. The unit cost for check dams is for the amount of material required, not number of dams.
| |
− | * If configuration include driveway (2 laned), a culvert pipe connects the enhanced grass swale (EGS) and an extra 0.1m of gravel is added beneath culvert.
| |
− | * Swales which cross multiple driveways or smaller driveways can be accounted for by multiplying or dividing these costs in the "Additional Costs" cells.
| |
| * The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal. | | * The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal. |
| ** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction. | | ** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction. |
Line 42: |
Line 36: |
| ==Construction Costs== | | ==Construction Costs== |
| | | |
− | [[File:Construction Breakdown EnhancedSwales Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] | + | [[File:Construction Breakdown EnhancedSwales Full Infil 2023.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] |
| | | |
| | | |
Line 48: |
Line 42: |
| | | |
| | | |
− | Above you can find a cost breakdown of a 1000m<sup>2</sup> LID configuration:<br> | + | Above you can find a breakdown of construction costs by expense type for a 200 m<sup>2</sup> surface area facility (I:P area ratio of 10:1):<br> |
| #[[Enhanced swales|Enhanced Swales: Full Infiltration]] | | #[[Enhanced swales|Enhanced Swales: Full Infiltration]] |
| | | |
− | Material & Installation expenses represent the largest portion of total construction costs (50%). | + | Material & Installation expenses represent the largest portion of total construction costs (55%). |
| | | |
| ==Life Cycle Costs== | | ==Life Cycle Costs== |
− | Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 45% of total life cycle costs over the 25-year evaluation period, and increase to 59% of total life cycle costs over the 50-year period, due to increased levels of litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering) cleaning out and vacuuming of the catchbasin, mowing, replacement of sod, weeding and pruning of the BMP's planted [[vegetation]]. | + | Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 39% of total life cycle costs over the 25-year evaluation period, and increase to 54% of total life cycle costs over the 50-year period, due to swale surface rehabilitation costs assumed to be required after 25 years of operation. |
| | | |
| ===25-Year life cycle cost break down=== | | ===25-Year life cycle cost break down=== |
| | | |
− | [[File:25yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']] | + | [[File:25yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']] |
| | | |
| <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> | | <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> |
| + | </br> |
| | | |
| ===50-Year life cycle cost break down=== | | ===50-Year life cycle cost break down=== |
| | | |
− | [[File:50yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']] | + | [[File:50yr LCCT EnhancedSwales Full Infil 2023.PNG|thumb|center|900px|'''Enhanced Swales: Full Infiltration''']] |
| | | |
| <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> | | <small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br> |
| + | </br> |
| | | |
| ==Cost Summary Tables== | | ==Cost Summary Tables== |
− | Total life cycle cost estimates for the [[Enhanced swale]] Full Infiltration design configuration is ($23,451.36), makign it one of the cheapest LID BMP options.<br> | + | Total life cycle cost estimate over the 50 year evaluation period for the [[Enhanced swale]] Full Infiltration design configuration is ($65,021.40), making it one of the cheapest LID BMP options.<br> |
| | | |
| ===Full Infiltration=== | | ===Full Infiltration=== |
− | [[File:CVC Office, Grass Swale.JPG|500px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]] | + | [[File:CVC Office, Grass Swale.JPG|650px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]] |
| | | |
− | [[File:Design Table EnhancedSwales Full Infil.PNG|700px]]<br> | + | [[File:Design Table EnhancedSwales Full Infil 2023.PNG|700px]]<br> |