Changes

Jump to navigation Jump to search
Line 40: Line 40:     
==Comparison of Life Cycle Costs by BMP Type==
 
==Comparison of Life Cycle Costs by BMP Type==
The following bar charts compare construction and life cycle cost estimates by LID BMP type for three main design scenarios: Full Infiltration Design; Partial Infiltration Design; and No Infiltration Design.  Design and O&M assumptions for each BMP type and scenario are as indicated in the above note.  All cost estimates generated by the LCCT have been divided by 2000 m<sup>2</sup> to produce values in Canadian dollars per square metre (CAD$/m<sup>2</sup>) of Contributing Drainage Area.  Cost estimates for a 2000 m<sup>2</sup> asphalt parking lot serviced by two catch basins and an oil and grit separator (OGS) are also provided for comparison.  
+
The following bar charts compare construction and life cycle cost estimates by LID BMP type for three main design scenarios: Full Infiltration Design; Partial Infiltration Design; and No Infiltration Design.  Design and O&M assumptions for each BMP type and scenario are as indicated in the above note.  All cost estimates generated by the LCCT have been divided by 2,000 m<sup>2</sup> to produce values in Canadian dollars per square metre (CAD$/m<sup>2</sup>) of Contributing Drainage Area.  Cost estimates for a 2,000 m<sup>2</sup> asphalt parking lot serviced by two catch basins and an oil and grit separator (OGS) are also provided for comparison.  
    
===Construction Cost Comparisons:===
 
===Construction Cost Comparisons:===

Navigation menu