===Notes===
===Notes===
−
* Designs include [[pretreatment]] through hydrodynamic separator ([[Oil and Grit Separator| i.e., oil and grit separator]]) and isolated chamber row.
+
* Design include [[pretreatment]] through hydrodynamic separator ([[Oil and Grit Separator| i.e., oil and grit separator]]) and isolated chamber row.
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.