==Total Cost & Design Summary==
+
==Cost Summary Tables==
 
Total life cycle cost estimates for the three porous asphalt configurations vary substantially with the No Infiltration design being highest ($160,519.90), compared to the Partial Infiltration design ($138,144.27), and followed closely by the Full Infiltration design ($131,972.30).
 
Total life cycle cost estimates for the three porous asphalt configurations vary substantially with the No Infiltration design being highest ($160,519.90), compared to the Partial Infiltration design ($138,144.27), and followed closely by the Full Infiltration design ($131,972.30).
  