Changes

Jump to navigation Jump to search
Line 56: Line 56:     
==Life Cycle Costs==
 
==Life Cycle Costs==
Below are capital and life cycle cost estimates for the three [[permeable pavements|permeable pavement]] configurations over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values.  Operation and maintenance costs are predicted to represent between 18 to 20% of total life cycle costs over the 25-year evaluation period, and increase to between 26 to 29% of total life cycle costs over the 50-year period, due to costs associated with restriping, replacement of limited number of pavers and flushing of underground pipes (underdrain and overflow) after 25 years of operation.  Estimates assume no rehabilitation of the permeable pavement surface is required over the 50 year timeframe.
+
Below are capital and life cycle cost estimates for the three [[permeable pavements|permeable pavement]] configurations over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values.  Operation and maintenance costs are predicted to represent between 18 to 20% of total life cycle costs over the 25-year evaluation period, and increase to between 26 to 29% of total life cycle costs over the 50-year period, due to costs associated with restriping, replacement of limited number of pavers and flushing of underground pipes (underdrain and overflow) after 25 years of operation.  Estimates assume no rehabilitation of the permeable pavement surface to maintain acceptable drainage performance is required over the 50 year timeframe.
     

Navigation menu