Changes

Jump to navigation Jump to search
Line 161: Line 161:  
===Inspection plan===
 
===Inspection plan===
   −
[[File:Construction duties flowchart.png|thumb|450px|right|Communication about inspection points between the owner, the engineer, and the contractor are critical for a successful project (adapted from TRCA, 2016).<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. Figure 6,3. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>]]
+
[[File:Construction duties flowchart.png|thumb|450px|right|Communication about inspection points between the owner, the engineer, and the contractor are critical for a successful project (adapted from TRCA, 2016).<ref>TRCA. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. Version 1.0. Figure 6.3. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>]]
    
The [[inspection and maintenance]] page gives detailed guidance on how to conduct construction inspections for LID practices. Generally, construction inspections should be continuous as the work progresses. If this isn’t possible, critical inspection points are:
 
The [[inspection and maintenance]] page gives detailed guidance on how to conduct construction inspections for LID practices. Generally, construction inspections should be continuous as the work progresses. If this isn’t possible, critical inspection points are:

Navigation menu