Changes

Jump to navigation Jump to search
Line 73: Line 73:     
==Inspection and Maintenance==
 
==Inspection and Maintenance==
Routine inspection and maintenance consists of checking and cleaning trash, debris and sediment from [[pretreatment]] devices, [[inlets]] and [[outlets]] twice a year in the spring and/or late fall, or when pretreatment device sump is half full. Use hydro-vac truck to remove sediment from catch basin sumps, [[OGS]] and isolated chamber row filter pre-treatment devices.  To clean isolated chamber row filters use a vacuum truck equipped with rear-facing jet nozzle for cleaning large diameter pipes or culverts.  
+
Routine inspection and maintenance consists of checking and cleaning trash, debris and sediment from [[pretreatment]] devices, [[inlets]] and [[overflow|outlets]] twice a year in the spring and/or late fall, or when pretreatment device sump is half full. Use hydro-vac truck to remove sediment from catch basin sumps, [[OGS]] and isolated chamber row filter pre-treatment devices.  To clean isolated chamber row filters use a vacuum truck equipped with rear-facing jet nozzle for cleaning large diameter pipes or culverts.  
    
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours).  Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed. <br>
 
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours).  Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed. <br>
Line 80: Line 80:     
{{Clickable button|[[File:Cover page underground.PNG|150px|link=https://wiki.sustainabletechnologies.ca/wiki/Inspection_and_Maintenance:_Underground_Infiltration_System]]}}
 
{{Clickable button|[[File:Cover page underground.PNG|150px|link=https://wiki.sustainabletechnologies.ca/wiki/Inspection_and_Maintenance:_Underground_Infiltration_System]]}}
  −
  −
<br>
  −
Take a look at the [[Inspection and Maintenance: Underground Infiltration Systems]] page by clicking below for further details about proper inspection and maintenance practices:
  −
  −
{{Clickable button|[[File:Cover page underground.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/wiki/Inspection_and_Maintenance:_Underground_Infiltration_Systems]]}}
      
==Gallery==
 
==Gallery==

Navigation menu