Changes

Jump to navigation Jump to search
no edit summary
Line 23: Line 23:  
<tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
 
<tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
 
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
 
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event.  The filter media bed should fully drain within a maximum period of 72 hours</td></tr>
+
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event.  The biomedia should fully drain within a maximum period of 72 hours</td></tr>
 
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
 
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
 
</table>
 
</table>
8,255

edits

Navigation menu