Changes

Jump to navigation Jump to search
Line 403: Line 403:  
[[File:Maintenance & operation p.p.JPG|thumb|400px|General time commitments and costs for inspection of permeable pavement features with partial infiltration design (in 2016 $ figures).<ref>TRCA. 2018. Inspection and Maintenance of Stormwater Best Management Practices. Permeable Pavements - Fact Sheet. https://sustainabletechnologies.ca/app/uploads/2018/02/Permeable-Pavement-Fact-Sheet.pdf</ref>]]
 
[[File:Maintenance & operation p.p.JPG|thumb|400px|General time commitments and costs for inspection of permeable pavement features with partial infiltration design (in 2016 $ figures).<ref>TRCA. 2018. Inspection and Maintenance of Stormwater Best Management Practices. Permeable Pavements - Fact Sheet. https://sustainabletechnologies.ca/app/uploads/2018/02/Permeable-Pavement-Fact-Sheet.pdf</ref>]]
   −
[[File:Life cycle estimate p.p.JPG|thumb|center|400px|Construction and life cycle cost estimates for permeable pavement features with partial infiltration design (in 2016 $ figures).<ref>TRCA. 2018. Inspection and Maintenance of Stormwater Best Management Practices. Permeable Pavements- Fact Sheet. https://sustainabletechnologies.ca/app/uploads/2018/02/Permeable-Pavement-Fact-Sheet.pdf</ref>]]<br>
+
[[File:Minimum & hig hfrequency costs.pp.JPG|thumb|center|400px|Construction and life cycle cost estimates for permeable pavement features with partial infiltration design (in 2016 $ figures).<ref>TRCA. 2018. Inspection and Maintenance of Stormwater Best Management Practices. Permeable Pavements- Fact Sheet. https://sustainabletechnologies.ca/app/uploads/2018/02/Permeable-Pavement-Fact-Sheet.pdf</ref>]]<br>
    
Estimates of the life cycle costs of inspection and maintenance have been produced using the latest version of the [[Cost analysis resources|LID Life Cycle Costing Tool]] for three design variations (full infiltration, partial infiltration and no infiltration) to assist stormwater infrastructure planners, designers and asset managers with planning and preparing budgets for potential LID features.
 
Estimates of the life cycle costs of inspection and maintenance have been produced using the latest version of the [[Cost analysis resources|LID Life Cycle Costing Tool]] for three design variations (full infiltration, partial infiltration and no infiltration) to assist stormwater infrastructure planners, designers and asset managers with planning and preparing budgets for potential LID features.

Navigation menu