Line 43:
Line 43:
* Include monitoring wells in design drawings and details and install at an appropriate time during construction, or as part of repair work for facilities in need of rehabilitation.
* Include monitoring wells in design drawings and details and install at an appropriate time during construction, or as part of repair work for facilities in need of rehabilitation.
* Ensure the perforated section of the well is located within the internal water storage reservoir or layer only, and that it extends to the bottom elevation of the practice at a minimum.
* Ensure the perforated section of the well is located within the internal water storage reservoir or layer only, and that it extends to the bottom elevation of the practice at a minimum.
−
* Design and install the well so that surface water will not affect water level readings. A standard monitoring well casing and cap to protect, secure and provide access to the well should also be included.
+
* Design and install the well so that surface water will not affect water level readings.
−
* Ensure there is a solid cap on the bottom of the well to provide a small water reservoir (e.g., 100 mm deep) to keep water level sensor submerged during dry conditions. This helps with checking calibration of the sensor as well.
+
* A standard monitoring well casing and cap or monument to protect, secure and provide access to the well should also be included.
+
* Ensure there is a solid cap on the bottom of the well to provide a small water reservoir (e.g., 100 mm deep) to keep the water level sensor submerged during dry conditions. This practice also helps with checking calibration of the sensor.
* Where possible, wells should be located in areas with little or no vehicular traffic for ease of access.
* Where possible, wells should be located in areas with little or no vehicular traffic for ease of access.