Changes

Jump to navigation Jump to search
Line 37: Line 37:  
*''S<sub>x</sub>'' is the cross slope ratio (typically between 0.015 and 0.04)}}
 
*''S<sub>x</sub>'' is the cross slope ratio (typically between 0.015 and 0.04)}}
   −
The value obtained for total inlet width (''W<sub>T</sub>'') can then be divided by the chosen number of inlets to determine the required width of each curb cut inlet.  Curb cut inlets draining roadways should be a minimum of 0.45 m in width and are typically no wider than 1.5 m.  The chosen number of inlets may be adjusted up or down to ensure individual inlet widths are within this range.  
+
The value obtained for total inlet width (''W<sub>T</sub>'') can then be divided by the chosen number of inlets to determine the required width of each individual curb cut inlet.  Curb cut inlets draining roadways should be a minimum of 0.45 m in width and are typically no wider than 1.5 m.  The chosen number of inlets may be adjusted up or down to ensure individual inlet widths are within this range.  
    
Where the available space for curb cuts is constrained and a greater flow into the BMP is desired, the effective cross slope (''S<sub>x</sub>'')  may be increased by adding a depressed concrete apron.
 
Where the available space for curb cuts is constrained and a greater flow into the BMP is desired, the effective cross slope (''S<sub>x</sub>'')  may be increased by adding a depressed concrete apron.

Navigation menu