Changes

Jump to navigation Jump to search
Line 227: Line 227:  
|-
 
|-
 
|rowspan="10" style="text-align: center;" | Permeable pavement with underdrain
 
|rowspan="10" style="text-align: center;" | Permeable pavement with underdrain
 +
|-
 +
|style="text-align: center;" |Montreal
 +
|style="text-align: center;" |26 to 98%
 +
|style="text-align: center;" |Vaillancourt ''et al.'' (2019) <ref>Vaillancourt, C., Duchesne, S., & Pelletier, G. 2019. Hydrologic performance of permeable pavement as an adaptive measure in urban areas: case studies near Montreal, Canada. Journal of Hydrologic Engineering, 24(8), 05019020.</ref>
 +
|-
 +
|style="text-align: center;" |Mississauga
 +
|style="text-align: center;" |61 to 99%
 +
|style="text-align: center;" |<span class="plainlinks">[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf CVC (2018)]</span><ref>CVC. 2018. Case Study: Monitoring Low Impact Development at the IMAX demonstration site. February, 2018. https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf</ref>
 +
|-
 +
|style="text-align: center;" |Seoul, Korea
 +
|style="text-align: center;" |30 to 65%
 +
|style="text-align: center;" |Shafique ''et al.'' (2018) <ref>Shafique, M., Kim, R. and Kyung-Ho, K., 2018. Rainfall runoff mitigation by retrofitted permeable pavement in an urban area. Sustainability, 10(4), p.1231.</ref>
 +
|-
 +
|style="text-align: center;" |Northern Ohio
 +
|style="text-align: center;" |16 to 99%
 +
|style="text-align: center;" |Winston ''et al.'' (2015) <ref>Winston, R. J., Dorsey, J. D., & Hunt, W. F. (2015). Monitoring the performance of bioretention and permeable pavement stormwater controls in Northern Ohio: hydrology, water quality, and maintenance needs. Chagrin River Watershed Partners. Inc. under NOAA award No. NA09NOS4190153.</ref>
 
|-
 
|-
 
|style="text-align: center;" |Vaughan, Ontario
 
|style="text-align: center;" |Vaughan, Ontario
 
|style="text-align: center;" |'''<u><span title="Note: Runoff reduction estimates are based on differences in runoff volume between the practice and a conventional impervious surface over the period of monitoring.">45%*</span></u>'''
 
|style="text-align: center;" |'''<u><span title="Note: Runoff reduction estimates are based on differences in runoff volume between the practice and a conventional impervious surface over the period of monitoring.">45%*</span></u>'''
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2016/02/KPP-Ext_FinalReport_Dec2015.pdf Van Seters and Drake (2015)]</span>
+
|style="text-align: center;" |<span class="plainlinks">[https://sustainabletechnologies.ca/app/uploads/2016/02/KPP-Ext_FinalReport_Dec2015.pdf Van Seters and Drake (2015)]</span><ref>Van Seters, T. and Drake, J. 2015. Five Year Performance Evaluation of Permeable Pavements. Kortright, Vaughan - Final Draft. December 2015. © Toronto and Region Conservation Authority. https://sustainabletechnologies.ca/app/uploads/2016/02/KPP-Ext_FinalReport_Dec2015.pdf</ref>
 
|-
 
|-
 
|style="text-align: center;" |North Carolina
 
|style="text-align: center;" |North Carolina
Line 248: Line 264:  
|style="text-align: center;" |45% to 60%
 
|style="text-align: center;" |45% to 60%
 
|style="text-align: center;" |Schueler ''et al.'' (1987)<ref>Schueler, T. 1987. Controlling urban runoff: a practical manual for planning and designing urban BMPs. Metropolitan Washington Council of Governments. Washington, DC. </ref>
 
|style="text-align: center;" |Schueler ''et al.'' (1987)<ref>Schueler, T. 1987. Controlling urban runoff: a practical manual for planning and designing urban BMPs. Metropolitan Washington Council of Governments. Washington, DC. </ref>
|-
  −
|style="text-align: center;" |Mississauga
  −
|style="text-align: center;" |61 to 99%
  −
|style="text-align: center;" |<span class="plainlinks">[https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf CVC (2018)]</span><ref>CVC. 2018. Case Study: Monitoring Low Impact Development at the IMAX demonstration site. February, 2018. https://cvc.ca/wp-content/uploads/2018/05/IMAX-Low-Impact-Development-Monitoring-Case-Study-may-24.pdf</ref>
  −
|-
  −
|style="text-align: center;" |Montreal
  −
|style="text-align: center;" |26 to 98%
  −
|style="text-align: center;" |Vaillancourt ''et al.'' (2019) <ref>Vaillancourt, C., Duchesne, S., & Pelletier, G. 2019. Hydrologic performance of permeable pavement as an adaptive measure in urban areas: case studies near Montreal, Canada. Journal of Hydrologic Engineering, 24(8), 05019020.</ref>
  −
|-
  −
|style="text-align: center;" |Northern Ohio
  −
|style="text-align: center;" |16 to 99%
  −
|style="text-align: center;" |Winston ''et al.'' (2015) <ref>Winston, R. J., Dorsey, J. D., & Hunt, W. F. (2015). Monitoring the performance of bioretention and permeable pavement stormwater controls in Northern Ohio: hydrology, water quality, and maintenance needs. Chagrin River Watershed Partners. Inc. under NOAA award No. NA09NOS4190153.</ref>
  −
|-
  −
|style="text-align: center;" |Seoul, Korea
  −
|style="text-align: center;" |30 to 65%
  −
|style="text-align: center;" |Shafique ''et al.'' (2018) <ref>Shafique, M., Kim, R. and Kyung-Ho, K., 2018. Rainfall runoff mitigation by retrofitted permeable pavement in an urban area. Sustainability, 10(4), p.1231.</ref>
   
|-
 
|-
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''
 
| colspan="2" style="text-align: center;" |'''<u><span title="Note: This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets.  Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority." >Runoff Reduction Estimate*</span></u>'''

Navigation menu