Changes

Jump to navigation Jump to search
no edit summary
Line 4: Line 4:  
ER Bioretention.jpg| Parking lot bioretention with decorative [[stone]] for erosion control, and perforated pipe access standpipe in foreground, Earth Rangers Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2014/09/STEP-Bioretention-Report_2014.pdf technical report].
 
ER Bioretention.jpg| Parking lot bioretention with decorative [[stone]] for erosion control, and perforated pipe access standpipe in foreground, Earth Rangers Centre, Vaughan, ON. Read about the performance of this practice in the [https://sustainabletechnologies.ca/app/uploads/2014/09/STEP-Bioretention-Report_2014.pdf technical report].
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|BrianAsh]]
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|BrianAsh]]
Elm Drive Bioretention.JPG|[[Bioretention]] cells on Elm Drive, Mississauga, ON, with vertical sides and hardscape perimeter receive road runoff via leader pipes from road catch basin [[inlet |inlets]].
+
Elm Drive Bioretention.JPG|[[Bioretention]] cells on Elm Drive, Mississauga, ON, with vertical sides and hardscape perimeter receive road runoff via leader pipes from road catch basin [[inlet |inlets]]. Read about the stormwater system at this site in the [https://cvc.ca/wp-content/uploads//2021/07/TechReport_Elm_Drive_Final.pdf performance assessment report].
 
Lakeside - sheet flow parking lot 1.JPG| The grade and lack of curb allow for sheet-flow runoff into this bioretention facility. Lakeside Park, Mississauga, ON
 
Lakeside - sheet flow parking lot 1.JPG| The grade and lack of curb allow for sheet-flow runoff into this bioretention facility. Lakeside Park, Mississauga, ON
 
File:Ultra urban bioret bump out 2.jpg|300px|Bioretention bump out in a dense urban setting receiving runoff via side inlet catch basin and [[Curb cuts |curb openings]] on the walkway side of the installation.
 
File:Ultra urban bioret bump out 2.jpg|300px|Bioretention bump out in a dense urban setting receiving runoff via side inlet catch basin and [[Curb cuts |curb openings]] on the walkway side of the installation.

Navigation menu