Changes

Jump to navigation Jump to search
Line 27: Line 27:     
===[[Underdrain |Underdrains]] and flow control devices===
 
===[[Underdrain |Underdrains]] and flow control devices===
LID facilities have been demonstrated to function well throughout frozen periods of the year even when all components were fully frozen for some part of the year.<br>
  −
<br>
   
[[Underdrain]] perforated pipes should be located below the frost line to reduce the threat of ice clogging. Ontario provincial standard drawings of frost penetration depth are available from the [https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx Ministry of Transportation] as OPSD 3090.100 for northern Ontario <ref> Ministry of Transportation. 2010. Foundation Frost Penetration Depths for Northern Ontario. OPSD 3090.100. Nov 2010. Rev.1. https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx </ref> and OPSD 3090.101 for southern Ontario <ref> Ministry of Transportation. 2010. Foundation Frost Penetration Depths for Southern Ontario. OPSD 3090.101. Nov 2010. Rev.1. https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx </ref>.<br>
 
[[Underdrain]] perforated pipes should be located below the frost line to reduce the threat of ice clogging. Ontario provincial standard drawings of frost penetration depth are available from the [https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx Ministry of Transportation] as OPSD 3090.100 for northern Ontario <ref> Ministry of Transportation. 2010. Foundation Frost Penetration Depths for Northern Ontario. OPSD 3090.100. Nov 2010. Rev.1. https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx </ref> and OPSD 3090.101 for southern Ontario <ref> Ministry of Transportation. 2010. Foundation Frost Penetration Depths for Southern Ontario. OPSD 3090.101. Nov 2010. Rev.1. https://www.library.mto.gov.on.ca/SydneyPLUS/TechPubs/Portal/tp/opsViews.aspx </ref>.<br>
 
<br>  
 
<br>  

Navigation menu