==Planning considerations==
 
==Planning considerations==
 
When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See [[Natural drainage]] and [[Existing hydrology]].  
 
When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See [[Natural drainage]] and [[Existing hydrology]].  
 +
 +
===Infiltration===
 +
Enhanced swales include check dams that can be designed to pond substantial volumes of water on the swale surface between flow events, so provide both stormwater conveyance and infiltration functions. 
 +
For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see [[Infiltration]].
    