Changes

Jump to navigation Jump to search
no edit summary
Line 13: Line 13:  
* The depth should be the greater of 200 mm or half the inflow pipe diameter.
 
* The depth should be the greater of 200 mm or half the inflow pipe diameter.
 
----
 
----
 +
[[Category:Pretreatment]]

Navigation menu