Changes

Jump to navigation Jump to search
100 bytes added ,  2 years ago
Line 51: Line 51:  
*Between 1 - 6 %, check dams are recommended to bring the compensation gradient <1 %.
 
*Between 1 - 6 %, check dams are recommended to bring the compensation gradient <1 %.
 
*Slopes > 6% can accommodate a series of stepped [[bioretention cells]], each overflowing into the next with a spillway.
 
*Slopes > 6% can accommodate a series of stepped [[bioretention cells]], each overflowing into the next with a spillway.
 +
 +
 +
For more information on planning considerations and site constraints see [[Site considerations]].
    
==Design==
 
==Design==

Navigation menu