Changes

Jump to navigation Jump to search
no edit summary
Line 13: Line 13:     
*'''Soil / Growing Medium''': Testing of soil to determine its structure, organic matter and confirm microbial level counts are satisfactory for selected vegetation will take place at installation and during performance diagnostic intervals. Whereas organic fertilizing and soil amendments recommended by testing will be done on an as-need basis.
 
*'''Soil / Growing Medium''': Testing of soil to determine its structure, organic matter and confirm microbial level counts are satisfactory for selected vegetation will take place at installation and during performance diagnostic intervals. Whereas organic fertilizing and soil amendments recommended by testing will be done on an as-need basis.
  −
*'''Soil Cells''': As these structural components for stormwater management are installed at the beginning stages of this BMP feature there are no routine maintenance tasks expected during the stated design life life of the feature. If there are please refer to the manufacturer and their warranty process. For replacement of components contact the soil cell manufacturer.
      
*'''Underdrain''': Flush out accumulated sediment with a hose or for more intensive clogging a pressure washer, done annually.
 
*'''Underdrain''': Flush out accumulated sediment with a hose or for more intensive clogging a pressure washer, done annually.

Navigation menu