Changes

Jump to navigation Jump to search
no edit summary
Line 5: Line 5:  
!Installation type
 
!Installation type
 
!Depth to high water or bedrock (m)<ref>Minimum depth between the base of the facility and the elevation of the seasonally high water table or top of bedrock</ref>
 
!Depth to high water or bedrock (m)<ref>Minimum depth between the base of the facility and the elevation of the seasonally high water table or top of bedrock</ref>
!Typical ratio of impervious <br>drainage area to permeable <br>facility footprint area
+
!Ratio of impervious drainage area to <br>permeable facility footprint area
 
!Native soil infiltration rate (mm/hr)<ref>Infiltration rate estimates based on measurements of hydraulic conductivity under field saturated conditions at the proposed location and depth of the practice</ref>
 
!Native soil infiltration rate (mm/hr)<ref>Infiltration rate estimates based on measurements of hydraulic conductivity under field saturated conditions at the proposed location and depth of the practice</ref>
 
!Head (m)<ref>Vertical distance between the inlet and outlet of the LID practice</ref>
 
!Head (m)<ref>Vertical distance between the inlet and outlet of the LID practice</ref>

Navigation menu