Changes

Jump to navigation Jump to search
Line 96: Line 96:  
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains.
 
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains.
   −
===Karst===
+
===[[Karst]]===
Infiltration trenches, chambers and soakaways are not suitable in areas of known or implied karst topography.  
+
Infiltration trenches, chambers and soakaways are not suitable in areas of known or implied karst topography.
    
===Setback from Buildings===
 
===Setback from Buildings===

Navigation menu