Changes

Jump to navigation Jump to search
Line 175: Line 175:  
* Should be minimum 150 mm dia. perforated HDPE or equivalent material, smooth interior wall and continuously perforated with geotextile sock.
 
* Should be minimum 150 mm dia. perforated HDPE or equivalent material, smooth interior wall and continuously perforated with geotextile sock.
 
* A standpipe from the underdrain pipe to the growing medium or pavement surface can be used for inspection and maintenance. The top of the standpipe should be covered with a sealable cap and secured with a vandal-proof fastener.
 
* A standpipe from the underdrain pipe to the growing medium or pavement surface can be used for inspection and maintenance. The top of the standpipe should be covered with a sealable cap and secured with a vandal-proof fastener.
Stormwater Distribution Pipe
+
 
 +
====Stormwater Distribution Pipe====
 
* Solid pipe from inlet structures should transition to perforated pipe once 300 mm inside the trench.   
 
* Solid pipe from inlet structures should transition to perforated pipe once 300 mm inside the trench.   
 
* Perforated pipe should be minimum 150 mm dia. rigid, smooth interior wall HDPE or PVC with perforations on sides, wrapped with geotextile sock, with capacity and perforation specifications confirmed by the designing Engineer based on hydraulic requirements.
 
* Perforated pipe should be minimum 150 mm dia. rigid, smooth interior wall HDPE or PVC with perforations on sides, wrapped with geotextile sock, with capacity and perforation specifications confirmed by the designing Engineer based on hydraulic requirements.

Navigation menu