Changes

Jump to navigation Jump to search
no edit summary
Line 25: Line 25:  
* geo-grids for sites with heavy vehicle loading
 
* geo-grids for sites with heavy vehicle loading
 
* monitoring wells and clean-outs
 
* monitoring wells and clean-outs
[[File:Frankenthal - Versickerungsfähige Pflaster.jpg|Frankenthal - Versickerungsfähige Pflaster]]
+
<gallery mode="packed-hover" perrow=5 widths=160px heights=160px>
<gallery mode="packed-overlay" perrow=5 widths=150px heights=150px>
   
File:Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavers (PICP) on a roadway.  
 
File:Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavers (PICP) on a roadway.  
 
File:Gridpavers.jpg|Permeable Grid System in parking stalls filled with gravel (Source: Alexander Eichler).
 
File:Gridpavers.jpg|Permeable Grid System in parking stalls filled with gravel (Source: Alexander Eichler).
339

edits

Navigation menu