*'''Base Construction''':  Aggregate should be placed in 100 mm to 150 mm lifts and compacted with a minimum 9 ton steel drum vibratory roller. A light weight deflectometer may be used to test compaction level of open graded stone and compare to specifications.
 
*'''Base Construction''':  Aggregate should be placed in 100 mm to 150 mm lifts and compacted with a minimum 9 ton steel drum vibratory roller. A light weight deflectometer may be used to test compaction level of open graded stone and compare to specifications.
 
*'''Weather''': Porous asphalt and pervious concrete require a specific temperature range to set properly and the setting time can be several days.<ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>
 
*'''Weather''': Porous asphalt and pervious concrete require a specific temperature range to set properly and the setting time can be several days.<ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>
   
==Inspection and Maintenance==
 
==Inspection and Maintenance==
 
Permeable pavements require regular inspection and maintenance to ensure proper functioning. The limiting factor for permeable pavements is clogging of the surface course or joint filler between pavers. As these start to fill, the trapped sediment becomes finer and finer until they eventually become clogged. Ideally, signs should be posted on the site identifying permeable pavement. This can also serve as a public awareness and education opportunity. See: [[Permeable paving: Maintenance|Permeable pavement: Maintenance]]
 
Permeable pavements require regular inspection and maintenance to ensure proper functioning. The limiting factor for permeable pavements is clogging of the surface course or joint filler between pavers. As these start to fill, the trapped sediment becomes finer and finer until they eventually become clogged. Ideally, signs should be posted on the site identifying permeable pavement. This can also serve as a public awareness and education opportunity. See: [[Permeable paving: Maintenance|Permeable pavement: Maintenance]]