==Time required to drain surface ponded water==
+
==Time required to drain surface ponded water (1D drainage)==
 
The following equation assumes one dimensional drainage over the surface ponding area.
 
The following equation assumes one dimensional drainage over the surface ponding area.
 
It is best applied to calculate the maximum duration of ponding on the surface of [[bioretention cells]], and upstream of the [[check dams]] of [[bioswales]] and [[enhanced grass swales]] to ensure all surface ponding drains within 48 hours.  
 
It is best applied to calculate the maximum duration of ponding on the surface of [[bioretention cells]], and upstream of the [[check dams]] of [[bioswales]] and [[enhanced grass swales]] to ensure all surface ponding drains within 48 hours.  