Changes

Jump to navigation Jump to search
Line 75: Line 75:  
K<sub>f</sub> is the minimum acceptable saturated hydraulic conductivity of the filter media or planting soil when compacted to 85% maximum dry density (mm/h).
 
K<sub>f</sub> is the minimum acceptable saturated hydraulic conductivity of the filter media or planting soil when compacted to 85% maximum dry density (mm/h).
   −
==Drainage time to empty facility==
+
==Time to drain the storage reservoir==
 
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
 
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
 
From left to right x = 12 m, x = 20 m]]
 
From left to right x = 12 m, x = 20 m]]
The target [[drainage time]] for the internal storage of an infiltration facility is typically between 48 and 72 hours or based on the average inter-event period for the location. See [[Drainage time]] for more information about how inter-event periods vary across Ontario and to help select what is suitable for the site. <br>
+
The target [[drainage time]] for the active storage reservoir depth of an infiltration facility is typically between 48 and 72 hours or based on the average inter-event period for the location. Contact the local municipality or conservation authority for criteria. See [[Drainage time]] for more information about how inter-event periods vary across Ontario and to help select what is suitable for the site. <br>
 
<br>
 
<br>
  

Navigation menu