Line 93: |
Line 93: |
| |} | | |} |
| | | |
− | * Tests must be conducted within 10 m of the infiltration practice footprint area. | + | * Tests must be conducted within 10 metres of the infiltration practice footprint area. |
− | * Tests should be performed within 48 hours of a rain event, when the soil is already near or at field capacity. | + | * Tests should be performed within 48 hours of a rain event, when the soil is already near, or at field capacity. |
| * Test locations should be spaced equidistant from one another. | | * Test locations should be spaced equidistant from one another. |
| * Make a minimum of seven (7) measurements (i.e. tests) for each test location (i.e., each test pit or borehole). | | * Make a minimum of seven (7) measurements (i.e. tests) for each test location (i.e., each test pit or borehole). |
| * An additional round of tests should be conducted at 1.5 metres depth below the proposed bottom elevation of the practice if there is significant variation in geologic formation, soil texture or bulk density compared to conditions at the proposed bottom elevation.<br> | | * An additional round of tests should be conducted at 1.5 metres depth below the proposed bottom elevation of the practice if there is significant variation in geologic formation, soil texture or bulk density compared to conditions at the proposed bottom elevation.<br> |
− | * To calculate the median infiltration rate of the native soil at the depth tested, discard the highest and lowest values obtained from each test location and calculate the median from the remaining measurements at the depth tested. | + | * To calculate the median infiltration rate of the native soil at the depth tested, discard the highest and lowest values obtained from each test location and calculate the median from the remaining measurements. |
| '''The recommendations above are guidelines''' | | '''The recommendations above are guidelines''' |
| Keep in mind that excessive testing and disturbance of the site prior to construction is not recommended.<ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix%20F%20-%20Soil%20Infiltration%20Testing%20Protocol.pdf</ref> | | Keep in mind that excessive testing and disturbance of the site prior to construction is not recommended.<ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix%20F%20-%20Soil%20Infiltration%20Testing%20Protocol.pdf</ref> |