Changes

Jump to navigation Jump to search
Line 132: Line 132:  
* Step 11: Compare required surface area of the practice to available space.<br>
 
* Step 11: Compare required surface area of the practice to available space.<br>
 
To decrease A<sub>p</sub>, consider increasing ponding depth if feasible and would not create a safety hazard, or decreasing catchment impervious area.
 
To decrease A<sub>p</sub>, consider increasing ponding depth if feasible and would not create a safety hazard, or decreasing catchment impervious area.
* Step 12:  Calculate catchment impervious area to practice permeable (footprint) area ratio, R and compare to recommended range in the table above:
+
* Step 12:  Calculate catchment impervious area to practice permeable (footprint) area ratio:
<math>R=A_{i}/A_{p}</math>
+
<math>R=A_{i}/A_{p}</math><br>
 +
Adjust either A<sub>i</sub> or A<sub>p</sub> to keep R between 5 and 20.
    
==Calculate peak flow rates==  
 
==Calculate peak flow rates==  

Navigation menu