* Step 3: Select a design surface ponding depth, d<sub>p</sub>' (m) to begin sizing with:<br>
 
* Step 3: Select a design surface ponding depth, d<sub>p</sub>' (m) to begin sizing with:<br>
 
For practices with soft (i.e. landscaped) edges and bowl-shaped ponding areas calculate the mean surface ponding depth:
 
For practices with soft (i.e. landscaped) edges and bowl-shaped ponding areas calculate the mean surface ponding depth:
<math>d_{p}'=d_{p, max}\times 1/2</math><br>
+
<math>d_{p}'=d_{p, max}\times 1/2</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*d<sub>p, max</sub> = maximum surface ponding depth (m)}}<br>
 
*d<sub>p, max</sub> = maximum surface ponding depth (m)}}<br>
 
For practices with hard edges and vertical-walled ponding areas (e.g., stormwater planter, soil cell) use the maximum ponding depth:
 
For practices with hard edges and vertical-walled ponding areas (e.g., stormwater planter, soil cell) use the maximum ponding depth:
 
<math>d_{p}'=d_{p, max}</math>
 
<math>d_{p}'=d_{p, max}</math>
 +
==Determine the required surface area of the practice==
 +
* Step 4: Calculate the surface (i.e footprint) area of the practice (A<sub>p</sub>) needed to capture runoff produced from the catchment during the design storm event:<br>
 +
For practices where flow is delivered to the filter media bed:
 +
<math>A_{p}=i\times D\times A_{i}/((d_{a} + (f_{m, min} \times D))
 +
{{Plainlist|1=Where:
 +
*i = Design storm intensity (mm/h)
 +
*D = Design storm duration (h)
 +
*A<sub>i</sub> = Catchment impervious area (m<sup>2</sup>)
 +
*f<sub>m, min</sub> = minimum infiltration rate of the filter media (mm/h)
 +
 +
    