Changes

Jump to navigation Jump to search
Line 53: Line 53:  
*Begin the drainage time calculation by dividing the area of the practice (''A<sub>p</sub>'') by the perimeter (''P'').
 
*Begin the drainage time calculation by dividing the area of the practice (''A<sub>p</sub>'') by the perimeter (''P'').
 
*Use the following equation to estimate the time (''t'') to fully drain the facility:  
 
*Use the following equation to estimate the time (''t'') to fully drain the facility:  
:<math>t=\frac{nA_{p}}{f'P}ln\left [ \frac{\left (d_{T}+ \frac{A_{p}}{P} \right )}{\left(\frac{A_{p}}{P}\right)}\right]</math>
+
:<math>t=\frac{nA_{p}}{f'x}ln\left [ \frac{\left (d_{T}+ \frac{A_{p}}{x} \right )}{\left(\frac{A_{p}}{x}\right)}\right]</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''n'' is the porosity of the fill materials within the practice, depth weighted mean
 
*''n'' is the porosity of the fill materials within the practice, depth weighted mean
 
*''A<sub>p</sub>'' is the area of the practice (m<sup>2</sup>),
 
*''A<sub>p</sub>'' is the area of the practice (m<sup>2</sup>),
 
*''f''' is the design infiltration rate (mm/hr),  
 
*''f''' is the design infiltration rate (mm/hr),  
*''P'' is the perimeter of the practice (m), and
+
*''x'' is the perimeter of the practice (m), and
 
*''d<sub>T</sub>'' is the total depth of the practice, including the ponding zone (m).}}
 
*''d<sub>T</sub>'' is the total depth of the practice, including the ponding zone (m).}}
  

Navigation menu