Changes

Jump to navigation Jump to search
Line 40: Line 40:  
They may be easily applied for any shape and size of infiltration facility, in which the reservoir storage is mostly in an aggregate.   
 
They may be easily applied for any shape and size of infiltration facility, in which the reservoir storage is mostly in an aggregate.   
   −
This spreadsheet tool has been set up to perform either of the above calculations.<br>
+
This spreadsheet tool has been set up to perform either of the above infiltration sizing calculations.<br>
<strong>[[Media:Infiltration Sizing.xlsx|Download .xlsx calculation tool]]</strong>
+
<strong>[[Media:Infiltration Sizing.xlsx|Download Infiltration Sizing.xlsx calculator tool]]</strong>
    
==Calculate drawdown time==
 
==Calculate drawdown time==

Navigation menu