Line 52: Line 52:  
*Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth. *Note that this component does not apply if a downstream riser is being used to control an extended saturation zone.   
 
*Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth. *Note that this component does not apply if a downstream riser is being used to control an extended saturation zone.   
 
*Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (''d<sub>s, max</sub>'', mm):
 
*Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (''d<sub>s, max</sub>'', mm):
<math>d_{s, max}=\frac{f'\times t}{0.4}</math>
+
<math>d_{s, max}=f'\times t</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''f''' = Design infiltration rate (mm/hr), and
 
*''f''' = Design infiltration rate (mm/hr), and
*''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements.
+
*''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements.}}
*''0.4'' = Void ratio of [[reservoir gravel|clear stone]]}}
      
===Additional step for system without underdrain===
 
===Additional step for system without underdrain===
 
* Step 4: Determine maximum permissible ponding depth (''d<sub>p, max</sub>''):
 
* Step 4: Determine maximum permissible ponding depth (''d<sub>p, max</sub>''):
<math>d_{p, max}=\frac{f'\times48}{0.4}</math>
+
<math>d_{p, max}=f'\times48</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''f''' = Design infiltration rate (mm/hr), and
 
*''f''' = Design infiltration rate (mm/hr), and
 
*48 = Drainage time of the ponding (hrs)
 
*48 = Drainage time of the ponding (hrs)
*0.4 = Void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
+
*Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
  