Line 52: |
Line 52: |
| *Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth. *Note that this component does not apply if a downstream riser is being used to control an extended saturation zone. | | *Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth. *Note that this component does not apply if a downstream riser is being used to control an extended saturation zone. |
| *Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (''d<sub>s, max</sub>'', mm): | | *Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (''d<sub>s, max</sub>'', mm): |
− | <math>d_{s, max}=\frac{f'\times t}{0.4}</math> | + | <math>d_{s, max}=f'\times t</math> |
| {{Plainlist|1=Where: | | {{Plainlist|1=Where: |
| *''f''' = Design infiltration rate (mm/hr), and | | *''f''' = Design infiltration rate (mm/hr), and |
− | *''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements. | + | *''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements.}} |
− | *''0.4'' = Void ratio of [[reservoir gravel|clear stone]]}}
| |
| | | |
| ===Additional step for system without underdrain=== | | ===Additional step for system without underdrain=== |
| * Step 4: Determine maximum permissible ponding depth (''d<sub>p, max</sub>''): | | * Step 4: Determine maximum permissible ponding depth (''d<sub>p, max</sub>''): |
− | <math>d_{p, max}=\frac{f'\times48}{0.4}</math> | + | <math>d_{p, max}=f'\times48</math> |
| {{Plainlist|1=Where: | | {{Plainlist|1=Where: |
| *''f''' = Design infiltration rate (mm/hr), and | | *''f''' = Design infiltration rate (mm/hr), and |
| *48 = Drainage time of the ponding (hrs) | | *48 = Drainage time of the ponding (hrs) |
− | *0.4 = Void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
| + | *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}} |
| * Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary. | | * Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary. |
| | | |