|Length||The well should extend into the native soil below the facility by a minimum 150 mm. Top should be above the surface overflow elevation or above the maximum ponding depth to prevent surface water from entering the well. If the perforated drainage pipe is installed in a v-notch below the bottom of the facility, the well should extend 150 mm below the invert of this drainage pipe. | |Length||The well should extend into the native soil below the facility by a minimum 150 mm. Top should be above the surface overflow elevation or above the maximum ponding depth to prevent surface water from entering the well. If the perforated drainage pipe is installed in a v-notch below the bottom of the facility, the well should extend 150 mm below the invert of this drainage pipe. |