Line 8: Line 8:  
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.   
 
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.   
 
----
 
----
Whilst this is a great rule of thumb, like all aspects of LID, this 1 meter figure might warrant discussion on a site-by-site basis.  
+
Whilst this is a great rule of thumb, like all aspects of LID, this 1 meter figure might require amendment on a site-by-site basis.  
 
Factors to consider include:  
 
Factors to consider include:  
 
*risks due to short periods of groundwater mounding and potentially unobserved seasonal fluctuations.  
 
*risks due to short periods of groundwater mounding and potentially unobserved seasonal fluctuations.  