Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Vertical separation
(view source)
Revision as of 18:09, 12 April 2019
1 byte removed
,
5 years ago
m
no edit summary
Line 8:
Line 8:
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.
----
----
−
Whilst this is a great rule of thumb, like all aspects of LID, this 1 meter figure might
warrant discussion
on a site-by-site basis.
+
Whilst this is a great rule of thumb, like all aspects of LID, this 1 meter figure might
require amendment
on a site-by-site basis.
Factors to consider include:
Factors to consider include:
*risks due to short periods of groundwater mounding and potentially unobserved seasonal fluctuations.
*risks due to short periods of groundwater mounding and potentially unobserved seasonal fluctuations.
Jenny Hill
8,255
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version