Feedback post on Site considerations
Jump to navigation
Jump to search
It is very difficult to achieve an I:P ratio of 20:1 for infiltration trenches/chambers, these are meant to be long narrow features that don't take up much surface area. To avoid overloading by sediment, which is the intention of minimizes I:P ratio, can use good pretreatment.
Is this feedback helpful?YesNo
142.46.20.58 found what they were looking for.
1 year ago