Feedback on Infiltration: Sizing and modeling

Jump to navigation Jump to search
3 posts
33% found what they were looking for
Sort by:

63.142.216.216 found what they were looking for.

2 years ago | Details
Great information. Please site which agency's accept these calculations.
Is this feedback helpful?YesNo

66.209.62.106 did not find what they were looking for.

5 years ago | Details
Equation for "Drawdown time to empty facility" 1) it is not clear in the equation whether the ln, is natural logarithm, or "I" (Impermeable Area i.e. catchment) and "n" (porosity) 2) the graphic with footprint area shows two footprint areas, but t...Equation for "Drawdown time to empty facility" 1) it is not clear in the equation whether the ln, is natural logarithm, or "I" (Impermeable Area i.e. catchment) and "n" (porosity) 2) the graphic with footprint area shows two footprint areas, but the caption states there are three and doesn't have the correct x for the 2nd shape.More
Is this feedback helpful?YesNo

174.94.130.141 did not find what they were looking for.

5 years ago | Details
The spreadsheet tool is said to calculate the 'drawdown time to empty the facility', but upon opening the spreadsheet, only 'total depth of storage required' and 'total area required' is calculated.
Is this feedback helpful?YesNo